By purchasing the materials/parts (some are contributions by our committee members) and doing the work ourselves, we save about 2/3 of the total cost if compared to the works if carried out by contractors. This was able to achieved by the commitment and cooperation of our committee members.
INFORMATION SIGNAGE A3 sizes printing & lamination of signage contribution by AJK David Teo
Police Contact & our KRT contacts |
Visitors Registration Requirement |
Renovation Contractors' Registration Requirement |
You don't comply YOU DO NOT ENTER |
Supply & installed by vendor
SIREN & BEACON (For Emergency case of threat to our Security guards by intruders & residents)
Two Sirens & a Beacon is installed by our committee members
Beacon |
Siren 1 |
Siren 2 |
Installation by our committee members
Front of guardhouse |
Rear of guardhouse |
Side (Facing out) of guardhouse |
Frame supply,fabrication and installation contribution by AJK Zen Wong. Roofing sheet installed by our committee members.
FRESH COAT OF PAINT
Paints for walls,contributed by AJK David Teo. Painting works completed by our committee members
Expenses for Guardhouse
upgrade
|
||
Material for Signboard stand
|
163.50
|
|
Material & Tools
|
864.80
|
|
Electrical parts & material
|
410.20
|
|
Labour to prepare visitor carpark site
|
100.00
|
|
1538.5
|
||
CCTV camera
|
840.00
|
Supply & install
|
2378.50
|
||
Sponsor
|
||
2 x 20ltr Emulsion Paint
|
AJK David Teo
|
|
Iron works
|
AJK Zen Wong
|
|
Guardhouse door (used)
|
Resident
|
|
Signboard (Used)
|
LKC Hardware
|
|
Est repainting work cost by contractor
|
RM 800.00
|
Supply & works
|
Est Siren,revolving lamp,control panel by contractor
|
RM 1,000.00
|
Supply & installation
|
Est Supply & Install door by contractor
|
RM 300.00
|
|
Est. Signboard by contractor
|
RM 2,500.00
|
Supply & Install
|
Est Wiring & installation of fluorescent lamps by contractor
|
RM 500.00
|
Supply & install
|
Estimated cost I work done by vendor
|
RM 5,100.00
|
|