Monday 14 May 2012

GUARDHOUSE UPGRADE

To all RESIDENTS
We are currently doing some upgrading work on our Security GUARDHOUSE. Please bear with us for any inconvenience caused during WORK PROGRESS. Work is expected to complete in 2 weeks time. As it is done on "GOTONG-ROYONG" basis by our Committee Members,thus work may extend beyond the stipulated time.

Kepada semua Penghuni-Penghuni
Kami sedang melakukan kerja-kerja menaik taraf di PONDOK PENGAWAL KESELAMATAN kami. Sila menanggung dengan kami bagi sebarang kesulitan yang ada semasa KEMAJUAN KERJA. Kerja dijangka siap dalam masa 2 minggu. Kerana ia dilakukan secara "gotong-royong" oleh Ahli Jawatankuasa kami, dengan kerja mungkin melampaui masa yang ditetapkan.

所有居民
目前,我们正提升警卫室,工程预计会在两个星期完成。
工程时间也许会延长因为这是筹委员自愿付出。
若有引起不便之处,请多多包涵。

 அனைத்து குடியிருப்போருக்கு
நாம் தற்போது நமது பாதுகாப்பு GUARDHOUSE சில மேம்படுத்தும் வேலையை செய்கிறாய். வேலை செயலில் போது ஏற்பட்ட சிரமத்திற்கு எங்களுக்கு தயவு செய்து பொறுத்து கொள்ளவும். வேலை 2 வாரங்களுக்கு நேரத்தில் முடிக்க எதிர்பார்க்கப்படுகிறது. அது எங்கள் குழு உறுப்பினர்கள் "GOTONG-ROYONG" அடிப்படையில் செய்யப்படும் என, இதனால் வேலை வழங்கவேண்டுமென்று ஒப்புதலும் நேரம் அப்பால் இருக்கலாம். (Google translate)



Work progress as at 10th May
Addition of CCTV cameras (2 units)
~Previously our guard house CCTV have only 2 camera, during Police personal viewing the CCTV, we found its difficult to view the vehicle regitration plate and visitors faces captured is blur.We added 2 more new ones of higher resolution for clearer view during playback.

Work progress as at 16th May 
Awnings
~Previously they use blinds to block rain and sunlight,this will reduce their vision of vehicles approaching.
The frame contributed by Committee Member Mr Zen Wong.He provided the material, fabrication & installation
 Siren (2 units) and alarm
~The purpose of this installation is for our Security guards usage in case of emergency & in danger of being attacked. (There was a case in another phase of Tmn Putra Prima, where a security guard was slashed on the head.)
Beacon with alarm sound
Siren
Lighting
~Currently only the front of the guard house is lighted with a single tube fluorescent lamp.When completed the guard house will have lights at all four sides.
Work progress as at 16th May 
Lighting
~Reposition of the florescent lamp (reflector) in front of guardhouse have the same lighting effect of our spotlight thus making the spotlight redundant.
~Install double florescent lamp at right side of guardhouse and in guard area.
~Install single florescent lamp at left side of guardhouse and back of guardhouse....
Now our guardhouse lights up like a Stadium at night. Bright and visible. 
 
 
 
Work progress as at.18th May 2012
~All electrical works completed.
 